The present timer does seem to be a two channel, albeit old, with a mechanical linkage for gravity setting.
However, if there is a 3 port valve (or 2 x 2 port) somewhere then it could be a fully pumped system just wired wrongly.
Would a gravity system work with the flow pipe going downwards through the pump as in the picture.
Why has the picture of the boiler wiring disappeared?
However, if there is a 3 port valve (or 2 x 2 port) somewhere then it could be a fully pumped system just wired wrongly.
Would a gravity system work with the flow pipe going downwards through the pump as in the picture.
Why has the picture of the boiler wiring disappeared?