I'm currently having a reasonably large extension built, so at the same time I thought i'd build a workshop, makes sense as there will already be bricks etc.. on site.
So managed to get hold of one of the brickies for a couple of days and made some reasonable progress, till we ran out of bricks.
No pics of the foundations unfortunately but it was dug out 10" then had 4" of hardcore and 6" of concrete ( os was it 6 of hardcore and 4 of concrete ), with some mesh.
After the first day:
and after the second day:
Just ordered a load more bricks, so when the brickie is on site for the extension this week he can do a bit more of this on the side.
Got a UPVC door and window to put in cheap, just need to sort the roof, which i'm doing myself.
So managed to get hold of one of the brickies for a couple of days and made some reasonable progress, till we ran out of bricks.
No pics of the foundations unfortunately but it was dug out 10" then had 4" of hardcore and 6" of concrete ( os was it 6 of hardcore and 4 of concrete ), with some mesh.
After the first day:
and after the second day:
Just ordered a load more bricks, so when the brickie is on site for the extension this week he can do a bit more of this on the side.
Got a UPVC door and window to put in cheap, just need to sort the roof, which i'm doing myself.