Evening guys,
I've got a consumer unit installed in a barn, it's a metal casing but has a plastic front. I'm planning to add a couple of circuits in the barn and also change the 6mm twin and earth on the catenary that's currently feeding the barn to an SWA that runs underground, RCD protected rather than just an MCB like the existing setup.
I will be having a proper guy do the final connections for me so it's all above board, I'm just doing the leg work to help with costs.
In doing this work though will I have to bring the CU up to current regs and change it for an all metal unit?
Thanks
Ed.
I've got a consumer unit installed in a barn, it's a metal casing but has a plastic front. I'm planning to add a couple of circuits in the barn and also change the 6mm twin and earth on the catenary that's currently feeding the barn to an SWA that runs underground, RCD protected rather than just an MCB like the existing setup.
I will be having a proper guy do the final connections for me so it's all above board, I'm just doing the leg work to help with costs.
In doing this work though will I have to bring the CU up to current regs and change it for an all metal unit?
Thanks
Ed.