That's what everyone says, but if one has to undertake that 'walk down the garden' more than once every few years, at worst, then one really ought to be investigating the cause of the trips and eliminating. I have electricity in a greenhouse, detached garage and a couple of sheds, and can't recall any occasion in which anything in any of them has ever resulted in an RCD trip.If the RCD trips up at the house you basically have to walk back to reset it that's my reasoning,
That would seem unnecessarily complicated, and a TD RCD would presumably not be adequate to protect the existing socket, anyway.I'd have it on a Time delay at the house if i was designing it personally with RCD at shed local to the installation.
Maybe, but, whether notified at the time or not, that is 'history'Sounds very much like the OP ran it himself as a new circuit anyway.
Not in England, but any outdoor electrical work remains notifiable in Wales.Is work to an outside installation notifiable these days or not?
Kind Regards, John