Pressure rising by 1bar is about right..
I would however lower the water pressure to about 1bar so the rise would take it to 2bar.
If the 1bar pressure is maintained overnight, it would suggest the prv is doing its job.
If not replace it.
?
I would however lower the water pressure to about 1bar so the rise would take it to 2bar.
If the 1bar pressure is maintained overnight, it would suggest the prv is doing its job.
If not replace it.
?