Thanks for the repsonses,
I have been thinking about this, I have recently removed a chimney breast to loft anf installed RSJ to support the remaining chimney (all apporved by building control). On one side I could install an RSJ in the celing of ground floor and build up breeze block wall to support the ceiling joists in the pictures. but the problem is the new rsj will need to be insatlled where the old chimney breast was and into party wall. I know that you are not allowed to install RSj into chimney breast but can i install one once the chimney breast has been rmeoved even though on the otherside of the party wall is my neigbours chimney breast.
I will have to speak to my architect and get the size designed but is this feasible? This leaves the porblem on the other side where there is a partition wall but there is no supporting wall on the ground floor and a partition wall sperates the bathroom from the bedroom. I was intending to replacing the existing partition wall with 4 by 2 timbers at 300 centres. I have already installed additional noggings on ground floor ceiling to support extra weight.
I have been thinking about this, I have recently removed a chimney breast to loft anf installed RSJ to support the remaining chimney (all apporved by building control). On one side I could install an RSJ in the celing of ground floor and build up breeze block wall to support the ceiling joists in the pictures. but the problem is the new rsj will need to be insatlled where the old chimney breast was and into party wall. I know that you are not allowed to install RSj into chimney breast but can i install one once the chimney breast has been rmeoved even though on the otherside of the party wall is my neigbours chimney breast.
I will have to speak to my architect and get the size designed but is this feasible? This leaves the porblem on the other side where there is a partition wall but there is no supporting wall on the ground floor and a partition wall sperates the bathroom from the bedroom. I was intending to replacing the existing partition wall with 4 by 2 timbers at 300 centres. I have already installed additional noggings on ground floor ceiling to support extra weight.