You lift floors and remove light fittings for a rummage when doing PIRs?
No, and I am aware that I will not find every instance of it, but I do:
- Remove a sample of recessed spot lights (these are rife for it, and also not maintaining adequate clearance from combustable materials etc)
- Stick my head up into the roof space
- Pop out ceiling tiles in offices, etc
- Open sample of light fixtures and look for the telltale sign of just a few single insulated cores comming through the ceiling with the rest pushed up