I've seen the website, in english lan. It say....
2. Cauldron assembly in closed system.
This is not consistent with the valid PN-91/B-02413 standard for solid fuel boilers. According to the standard, a compensatory vessel is required.
This mean it need a feed and expan tank. Therefore a sealed system can't be used.
The standard is for Poland.
2. Cauldron assembly in closed system.
This is not consistent with the valid PN-91/B-02413 standard for solid fuel boilers. According to the standard, a compensatory vessel is required.
This mean it need a feed and expan tank. Therefore a sealed system can't be used.
The standard is for Poland.