You clearly have never designed and installed a ch system on a HE boiler, nor read the spec from the manufacturer.I would expect 15% saving minimum on a like for like basis with weather compensation.
You clearly have never designed and installed a ch system on a HE boiler, nor read the spec from the manufacturer.I would expect 15% saving minimum on a like for like basis with weather compensation.
You clearly have never designed and installed a ch system on a HE boiler, nor read the spec from the manufacturer.I would expect 15% saving minimum on a like for like basis with weather compensation.
As a chartered engineer (I am laughing here) clearly you haven't read the CIBSE reports on the merits or otherwise of oversizing radiators?
what you expect and what happens don't always coincideI would expect 15% saving minimum on a like for like basis with weather compensation.
15-20% of the difference between band d and a; not 15% of the total. If you're so good at German, how come you didn't pick that up?Viessmann quote 15%, if you can understand German and read test.de, they also quote more than 15% for WC.
So what would you say should the return temp be?You are, as ever, missing the point. The FLOW temperature needs to be below 53C for full condensation to occur,
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local