Help, measured pitch wrong, halfway through tiling

Joined
8 Jun 2009
Messages
39
Reaction score
0
Location
Aberdeen
Country
United Kingdom
Shed build

Calculated a 12 degree roof at 20 degrees (don't ask , I don't know how!) , so went ahead and got slates with a minimum 20 degree spec.

have now done half the slating, and realise I'll have to dump slates and start over or raise the pitch.

I think with a load of supports on walls ( all wood build) it may be possible, if acro props can be adjusted to raise the roof while in situ??????

Or can they just be positioned to bear weight rather than being able to raise a load??

Thanks, Des
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top