I'm having scaffolding fitted to my two storey extension next week. The brickwork is already at 3.5M so I'm going for a single lift at that level which will also put it at a good working height for my eaves which are at 4.5 metres.
Will I be expected to make any other decisions on site - e.g. the off-stand from the wall, which I presume should be as little as possible other than the width of a spirit level. Anything else to consider?
Cheers
Gary
Will I be expected to make any other decisions on site - e.g. the off-stand from the wall, which I presume should be as little as possible other than the width of a spirit level. Anything else to consider?
Cheers
Gary