Can I have a general consensus here please. In running a sub main to out building (from non RCD protected way in main consumer unit) would you use an enclosure housing RCD in main build at transition from SWA to T&E (even though swa is ducted at req' depth & not exposed) and use enclosure or cu at outbuilding to house mcb's. Or just join in adaptable box and house rcd in outbuilding cu??
Also having never used 4 core 6mm swa, can anyone comment on the likelihood of me terminating(without horribly stressing) into MK insulated 2 or 4 module enclosure with a straight approach.
Thanks for your comments in anticipation guys.
Also having never used 4 core 6mm swa, can anyone comment on the likelihood of me terminating(without horribly stressing) into MK insulated 2 or 4 module enclosure with a straight approach.
Thanks for your comments in anticipation guys.