shouldnt there be building paper over the battens before the mesh to stop you breaching the cavity otherwise snots are going to fall and eventually breach across??
this post cofirms what i said about savingIt would cost more in terms of me taking time off work than it would save us on the cost of his labourer (£40/day), so that's not really an option. But good idea anyway, thats what I'm doing with our electrician (but he works saturdays )
so does thisStainless mesh is out of the question - its 5 times the price, so instead of £300 it's £1500.
NHBC do say to put a strip of dpc between each batten and the mesh, to protect from the swelling mentioned by rouchcaster, but I forgot to do it
Not entirely sure how I'd go about taking it off without ruining it tbh, so from that point of view attaching another layer of mesh seems the most obvious thing to do - and an extra £1000 for this guy's labour is STILL cheaper than buying stainless mesh!
I cant upload photos tonight on this little computer, will do tomorrow morning
and so is this one m8 im just saying how i see it ilmaoHere's a few photos:
Wall construction - there is a 50mm cavity between the face of the Tyvek and the mesh, formed by horizontal battens at 600mm centres (which are screwed to the main studs) and vertical battens at ~300mm centres which are screwed to the horizontal battens. The mesh is stapled to the battens at about 5" or 6" centres:
To counter the fact that a) you all seem to be saying we havent overlapped the mesh enough and b) we forgot the dpm strips to isolate the battens, and some of you think we should have used stainless mesh, I think putting on a second layer of mesh is probably advisable anyway. It's only going to cost another £300 and wont take all that long for me and my girlfriend to put up.
This is the bit he managed to do, filled all the way back to the Tyvek with render:
So we broke all that out before it set:
And this is the bit he did on a double layer of mesh, which seemed to work far more effectively. You cant see it in this picture obviously, but there is a clear cavity maintained behind the battens, which is what we need for the house to work properly:
I didnt realise that his original quote for a scratch coat and a top coat was not valid for this form of construction, had I known that maybe this wouldnt have happened, but a quote of £3850 instead of £2850 is still cheaper than the one we had for a polymer throughcoloured render (£4500), and is still ok in terms of price per square metre really.
He gave me a rough estimate of 2 people + a labourer for three days of £800, plus materials about £200 = £1000 to do the base coat on a double layer of mesh, then he would proceed with the quote as before, ie two further coats on top of the base coat.
well said jr there was no offence meant i just say things as i see themi dnt think offence was ment at all i think if anything frustration has preveiled and i can understand.
at the end of the day you asked for our professional advice and we gave it, you have however decided to stick with what you was doin in the first place.
yes you are correct in it will be cheaper to carry one with a second layer and just coat it up but ....... the battens will swell and shrink you could intrude on the void with rener falling through, the eml could corrode (you mite be lucky and it might not), the plasterer you are useing clearly knows nothing about what he is doin and his second scratch on that exsisting "smooth" scratch is more than likley goin to come away as it has nouthing to key into,
these are all signs that its goin to end badly for you in the long run this is what we are trying to show you, there are many reasons as to why you should stop before you get to far into it, if we was giveing you just one reason then mabey disagreeeing with us would be understandable but we are giveing you many FREE PROFESSIONAL TIPS and advice to assure you get the best quality job that anyone deserves.
i do not want to offend you at all but it seems a bit of a pointless thread for us to put in the effort for you to decide to stay as you was despite the book of reasons we have given you not to, im sorry you feel insulted but come on youve bin given alot to tips as to how to do the job properly and we can only hope you decide to use them next timeyou have to do this and trust me you will.
That was his justification for needing three coats rather than two. He said to me "look theres no way I can scratch that, so I'll have to do three coats"
So what you're saying is that his first coat should stick out more and then be scratched? What is a 'pr1ck' coat then? Im confused
stevethespreader said:this post cofirms what i said about savingPikeyDIY said:It would cost more in terms of me taking time off work than it would save us on the cost of his labourer (£40/day), so that's not really an option. But good idea anyway, thats what I'm doing with our electrician (but he works saturdays )
i see you dindent mention the 3rd quote so ill do it for you "a quote of £3850 instead of £2850 is still cheaper than the one we had for a polymer throughcoloured render (£4500), and is still ok in terms of price per square metre really." if you had took that option it probably would have been done in 2-3 days and it would have been done right ,ive had a go at that and we managed to scratch coat a whole 2 story new build cottage in one day, and about me not being helpfull well the advice i gave you was to take the lads advice and you havent done that you even had to counter your reasons against what some of them have said ive had it with your post now there must be over a 100 years worth of experience on this one( collectivley) giving advice and i see it has fallen on deaf ears im taking your post out of my watching liststevethespreader said:this post cofirms what i said about savingPikeyDIY said:It would cost more in terms of me taking time off work than it would save us on the cost of his labourer (£40/day), so that's not really an option. But good idea anyway, thats what I'm doing with our electrician (but he works saturdays )
No it doesnt - why would I take a day off work to spend it shovelling sand and cement into a mixer all day, busting my gut - when instead I could be sat in my office earning MORE money than I'd be paid for being a labourer for a day??????? THINK about it
That second quote is nothing to do with cutting costs - STAINLESS MESH IS NOT REQUIRED. Why on gods green earth would I spend over a thousand pounds for something that I JUST DONT NEED??????
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local