When I was 18 I did a summer job labouring at a water treatment works which was under construction.
We spent weeks filling the huge RC water filters with graded material.
Pebbles on the bottom, then gravel, then sand, topped off with anthracite.
Up two flights of stairs with 50kg bags on our shoulders before dumping them into the pit...every day! Only got a break when it came to rake the material level...never been so fit!
We spent weeks filling the huge RC water filters with graded material.
Pebbles on the bottom, then gravel, then sand, topped off with anthracite.
Up two flights of stairs with 50kg bags on our shoulders before dumping them into the pit...every day! Only got a break when it came to rake the material level...never been so fit!