Hi, We are planning to build a games room over a Thames Water pipe which is 823mm. They (TW) wrote to me saying that i would need:
- A Pre condition survey has to be carried out before any works can start to understand the condition of asset. Once works complete a post condition survey is required. Both surveys are an additional cost to yourself.
- Location of sewer has to be confirmed by either exposing sewer in ground along length being built over or carrying out a sonde survey (this can be done whilst the Pre condition survey is being carried out). Location of sewer is essential so you do not disturb / hit sewer during your works.
Has anyone within the forum has had any experience of doing this and how much did cost?
Thanks in advance.
Charan
- A Pre condition survey has to be carried out before any works can start to understand the condition of asset. Once works complete a post condition survey is required. Both surveys are an additional cost to yourself.
- Location of sewer has to be confirmed by either exposing sewer in ground along length being built over or carrying out a sonde survey (this can be done whilst the Pre condition survey is being carried out). Location of sewer is essential so you do not disturb / hit sewer during your works.
Has anyone within the forum has had any experience of doing this and how much did cost?
Thanks in advance.
Charan