I have a traditional gravity fed HW & pumped CH system and due to a refitting of my kitchen need to redirect a couple of the pipes.
On the gravity side the pipes are 28mm and I need to move them across the room slightly but most local DIT centres only stock 15mm and 22mm.
Do I have to use 28mm or will 22mm allow sufficient flow rate? Also if I need to use 28mm do you know where I can find this? I have only found one merchant so far but will only supply this in bulk and I only need a couple of metres!