- Joined
- 17 Dec 2018
- Messages
- 580
- Reaction score
- 15
- Country
Floorboards are up temporarily so want to take advantage and get the wiring through for an EV charger
My question is is my existing set up okay for something like a 7.5kw EV charger?
Also what size cable(s) do I need?
Consumer unit is 4m away from where EV charger will be. EV charger will be on external wall where trench is
My question is is my existing set up okay for something like a 7.5kw EV charger?
Also what size cable(s) do I need?
Consumer unit is 4m away from where EV charger will be. EV charger will be on external wall where trench is