Workshop update

Joined
7 Feb 2008
Messages
164
Reaction score
0
Country
United Kingdom
A little while ago I posed some pictures of the start of my workshop.
Its now almost finished, so I thought it time for an update:

As all the brickwork was finished, I painted the inside and the floor, and had my lathe dropped into place:

IMG_0094.jpg



IMG_0102.jpg



IMG_0105.jpg



IMG_0106.jpg


So next up, it was time to get the roof done, I had the chippy from my extension knock the roof up one weekend, then I tiled it myself.

IMG_0118.jpg



IMG_0119.jpg


IMG_0120.jpg



IMG_0132.jpg


Still got to cut the edge tiles, and do the verge and mortar the ridge tiles in place, but i'll do that shortly.

The reason there is a hole in the one gable end is a copy of someones workshop on here, to allow me to store long bits in the roof space, a door is being made up for it but I havent sourced any hinges yet.

I've also started to wire it up, and fill it up.

IMG_0148.jpg

IMG_0149.jpg

IMG_0150.jpg


Got my bargain £15 installed now too.
Metal clad sockets, and nice 20mm conduit.
Also wiring a few E-stops which will cut the power off to all sockets and the lathe, bandsaw, compressor etc....

IMG_0147.jpg



Still lots to do though :)
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top