Hi All,
I could do with some advice on the key differences between the 2006 and 2008 versions of the IEE wiring regulations if anyone would be willing to help-
Essentially I recently moved into a 60's property, which had not been electrically modernised and had the consumer unit and lighting circuits (2 wire to 3 wire) replaced and a few extra sockets added (in total work took place in all the awkward areas- the kitchen, bathroom and externally). The contractor in question was an ex-electrician friend who was a little down on his luck, and was only certified to 2006 regs. Nontheless he filled out an appropraite installation certificate, and told us that buildings control would have to verify it's suitability.
The bottom line is that BC(contrator) have rejected it, without physical inspection, stating that the work was done to 2006 vs 2008 regs. I think the final report came out at 8 words, which I personally find slightly galling for a £95 outlay! I was at least expecting a series of points to be addressed to be highlighted. My question, finally: are the changes between 2006/2008 of such magnitude that this "brief" rejection is justified?
Would someone be able to highlight the key differences between the regs as referenced to:
- lighting circuits: replacing 2 wire with 3 wire
- CU: replacement of wire fuses with modern breakers
- addition of external lights
- Additional sockets on the ringmains. (wiring still original)
clearly I am hopefully intending to show that the differences are immaterial to the installation in question- Apologies for the long post, thank you if you've got this far- any help would be much appreciated!
Kind regards
I could do with some advice on the key differences between the 2006 and 2008 versions of the IEE wiring regulations if anyone would be willing to help-
Essentially I recently moved into a 60's property, which had not been electrically modernised and had the consumer unit and lighting circuits (2 wire to 3 wire) replaced and a few extra sockets added (in total work took place in all the awkward areas- the kitchen, bathroom and externally). The contractor in question was an ex-electrician friend who was a little down on his luck, and was only certified to 2006 regs. Nontheless he filled out an appropraite installation certificate, and told us that buildings control would have to verify it's suitability.
The bottom line is that BC(contrator) have rejected it, without physical inspection, stating that the work was done to 2006 vs 2008 regs. I think the final report came out at 8 words, which I personally find slightly galling for a £95 outlay! I was at least expecting a series of points to be addressed to be highlighted. My question, finally: are the changes between 2006/2008 of such magnitude that this "brief" rejection is justified?
Would someone be able to highlight the key differences between the regs as referenced to:
- lighting circuits: replacing 2 wire with 3 wire
- CU: replacement of wire fuses with modern breakers
- addition of external lights
- Additional sockets on the ringmains. (wiring still original)
clearly I am hopefully intending to show that the differences are immaterial to the installation in question- Apologies for the long post, thank you if you've got this far- any help would be much appreciated!
Kind regards