Thanks very much. Just one query before I attempt this later this afternoon…Yes, that all appears OK.
All that would remain to be done, would be the safe isolation of the cables to the existing stats.
I’m going to have to link the Grey cables from the valves with the brown cables from the Hive Receivers? If so I’m going to struggle to fit four cables within that terminal block numbered ten. There is a link cable above from the top of the block on 10 to the top of terminal 15. Would I be able to link the brown cables in there instead?