Hi
in the next 24 months we will be moving building.
The current wood workshop has 3 x 3 phase equipment
Another has a single 3ph supply
a third has no 3ph but does have a 30A single phase socket
The rooms also have a reasonable ring main of 13A sockets.
Without going nuts, and increasing costs too much, I assume that in a new build it is relatively easier to double the number of 3 phase sockets/supplies in comparison to later having an extra supply retro fitted?
Obviously this depends on supply but there is a whack great substation next door to the site.
what's the sensible mix of "future proofing" v OTT provision?
in the next 24 months we will be moving building.
The current wood workshop has 3 x 3 phase equipment
Another has a single 3ph supply
a third has no 3ph but does have a 30A single phase socket
The rooms also have a reasonable ring main of 13A sockets.
Without going nuts, and increasing costs too much, I assume that in a new build it is relatively easier to double the number of 3 phase sockets/supplies in comparison to later having an extra supply retro fitted?
Obviously this depends on supply but there is a whack great substation next door to the site.
what's the sensible mix of "future proofing" v OTT provision?