here is the situation....
3 separate buildings... 2 are used and need 3 phase as well as single phase... the other building isnt used, but is where the power comes in...
so very simply would it be best to have a distribution board where the power comes in, then have two swa cables supplying 3 phase to both buildings, and then just take the single phase supply at each building?
I think this is what my electrician was trying to say to me, i just want opinions if this is the best way of distrubuting the power, or if there is a better way.
3 separate buildings... 2 are used and need 3 phase as well as single phase... the other building isnt used, but is where the power comes in...
so very simply would it be best to have a distribution board where the power comes in, then have two swa cables supplying 3 phase to both buildings, and then just take the single phase supply at each building?
I think this is what my electrician was trying to say to me, i just want opinions if this is the best way of distrubuting the power, or if there is a better way.