Couple of remaining doubts before I finalise my bathroom supplementary bonding arrangements:-
1. Metal towel rail, metal pipes. The pipes are bonded just beneath the floor (with solder+crimp). Do i have to additionally bond the towel rail itself? or is the fact that it's connected with metal bits to the bonded metal pipes good enough?
2. My bath taps and basin taps and toilet cistern feed are all fed from the same pipes, just tees for each service. total length of pipe is about 2 metres. Pipes are copper, soldered, no plastic or anything. Is it sufficient to bond at the bath tee end, and not bond the basin pipes and toilet pipe specifically, since they're connected to the bath end by means of the copper pipe?
thanks
slip
1. Metal towel rail, metal pipes. The pipes are bonded just beneath the floor (with solder+crimp). Do i have to additionally bond the towel rail itself? or is the fact that it's connected with metal bits to the bonded metal pipes good enough?
2. My bath taps and basin taps and toilet cistern feed are all fed from the same pipes, just tees for each service. total length of pipe is about 2 metres. Pipes are copper, soldered, no plastic or anything. Is it sufficient to bond at the bath tee end, and not bond the basin pipes and toilet pipe specifically, since they're connected to the bath end by means of the copper pipe?
thanks
slip