Here is another update bringing us to early September 2018.
Most notable work is -
UFH spreader plates installed
UFH pipework installed
House fully skimmed (third and final professional on site)
Doorcasings filled/sanded
Painting mist coat started
Kitchen -
Hallway -
Living Room -
Under Stairs -
Front Bedroom -
Side Bedroom -
Rear Bedroom -
Most notable work is -
UFH spreader plates installed
UFH pipework installed
All plumbing pipework installed
18mm engineered wood flooring installedHouse fully skimmed (third and final professional on site)
Doorcasings filled/sanded
Painting mist coat started
Kitchen -
(Access hole)
Hallway -
Living Room -
Under Stairs -
Front Bedroom -
Side Bedroom -
Rear Bedroom -