I have an EV charger on the side of my house but want to have it relocated to half way up my driveway.
It’s currently on 6mm SWA, can this be joined and a new length of 5m be added or would a sparky need to re run the whole route?
Thanks.
It’s currently on 6mm SWA, can this be joined and a new length of 5m be added or would a sparky need to re run the whole route?
Thanks.