Fair enough.In effect it forms part of our T&Cs for a new or altered supply
See the specification below for out door meter reading facilities where it states
Customer's switches on inside wall within 1800mm of meter board
http://www.enwl.co.uk/docs/connections/guidance-for-meter-board-layout-for-domestic-connections.pdf
Which it won't if the tails are too long, or Ze too high, for the supply fuse to operate in 5s if there's a fault on the tails.ENWL said:The electricity supply and earth facility will be provided on the basis that the installation will conform with the
safety requirements contained within the IEE Wiring Regulations.
Bit of a Mexican stand-off, really.